Planning Board Approves Horsepower Lane Subdivision
The West Bridgewater Planning Board closed its long-running Horsepower Lane Springsbury subdivision hearing and approved a loading-dock addition at D'Angelo's Manly Street building.
Planning Board · Meeting of August 5, 2026
WEST BRIDGEWATER — The West Bridgewater Planning Board closed its long-running Horsepower Lane Springsbury subdivision hearing and approved a loading-dock addition at D'Angelo's Manly Street building. Engineer Scott Sarris of MJM Construction told the board the applicant upgraded curbing from sloped to vertical granite to keep trucks off the pavement edge, saying "I need a waiver because I'm not doing exactly what you're telling me." The board also informally backed paving a gravel trailer lot at 600 Manly Street after an engineer found pavement "does not really change the numbers" for stormwater drainage. Separately, the board continued applications from Lou Tarantino's LJDE LLC to September 2 and from Andre and Luana Ferreira to August 19, and set a September 2 public hearing on relocating a drive-through window and storage tanks at 506 West Center Street.
Luana Ferreira told the board, "We asked an extension until the 19th because we're waiting for the surveyor to give us the site plan."
In the full story:
- Who Was There
- Organizations And Documents Referenced
- The complete report — 2,784 words
Source: the Planning Board meeting of August 5, 2026, reported from the official video recording and transcript.
Members read the rest of this story and every West Bridgewater meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this story
Know someone in West Bridgewater who follows town government? Share Townbrief West Bridgewater: they can sign up free.